When is a task done? Write completion criteria that prevent avoidable rework

Before starting a task, state the deliverable, scope, checks, and evidence location. Completion should be something you can inspect. “Improve this” and “mostly finished” leave the final decision to interpretation.

Jump to the template

Everyday task criteria differ from Scrum's Definition of Done. The Scrum Guide applies that term to the quality state of an Increment. Criteria specific to one piece of work do not replace a team's shared quality commitment.

Replace an activity with a result

“Organize user feedback” names an activity. “Consolidate signup findings from U01–U03, retaining sources, problems, and proposals for review” defines a result. Submitting a proposal still does not prove that it works.

Make the check repeatable by another person. Give numbers a counting rule, files a version, and screens an inspection path. If someone else's approval is required, specify who confirms what.

Decisions and examples
SituationResponseRecord to keep
Organize feedbackRetain a source and problem for U01–U03Consolidated draft v1
Check copyCompare each label with actual behaviorPath, version, and result
Submit for reviewSend a named version with open questionsSubmission; acceptance separately

A failed check keeps the work open

DONE-01 has a finished-looking feedback draft but lacks the source location for U03. The task remains open until that reference is supplied. Formatting the document does not remove the traceability requirement.

DONE-01: inspect the feedback draft — The missing U03 reference keeps the draft task open.
The missing U03 reference keeps the draft task open.

Match the checks to the work. A simple reply needs less inspection than material supporting a product decision. The purpose is to resolve uncertainty, not to maximize checklist length.

Separate omissions from added scope

If three interview sources were agreed, a missing source is unfinished original work. A later request for five more interviews is added scope that needs a fresh time and priority decision.

In TodoNote, write the criteria in the task note and separate independent checks into subtasks. Compare results before completion. Submission and another person's acceptance should remain distinct events.

Ask how you will check it

If you cannot describe a check, clarify the audience, purpose, or boundary first. That clarification can itself be the next action before you commit to delivery.

Retain omissions that caused rework and reuse the lesson for similar tasks. Final project acceptance still needs its own broader review; one completed subtask cannot stand in for it.

A template to copy

Task and purpose:
Deliverable and version:
Included scope:
Excluded scope:

Completion checks:
Inspection method:
Results and evidence locations:
Who must confirm what:
Failed checks:
Added scope and decision:
Plan your next step in TodoNote