Skip to content

Download TodoNote

Your tasks and notes, now on your desktop.

Download for Mac

Apple Silicon · macOS 11+

Download for Windows

Intel / AMD x64 · Windows 10 (2004+) / 11 · Microsoft Store

Desktop app · 1.1.9

A little help getting started.

First launch on MacNot yet notarized. You may need to allow the app in Privacy & Security.
  1. Move to Applications

    Open the downloaded DMG and drag TodoNote into Applications. Launch it from there.

  2. Allow the app to open

    This app is not Developer ID signed or notarized by Apple. If macOS blocks it, open System Settings → Privacy & Security after trying to launch it, then choose Open Anyway and confirm.

    Apple’s opening instructions
  3. Sign in and start

    Sign in with your existing account. Your tasks and notes sync with the web app.

First launch on WindowsInstall and update through Microsoft Store.
  1. Install from Microsoft Store

    Open the Microsoft Store page and select Get or Install. TodoNote will be added to your Start menu.

  2. Automatic updates

    Microsoft Store updates TodoNote automatically when app updates are enabled. You can also check for updates in Downloads or Library.

  3. Sign in and start

    Sign in with your existing account. Your tasks and notes sync with the web app.

How do I update?

Update steps depend on your desktop platform. Your tasks and notes stay with you.

Mac

Quit the app, download the new version here, and replace the app in Applications. Keep your app data so your local notes and sign-in remain available.

Windows

Microsoft Store updates TodoNote automatically when app updates are enabled. You can also check for updates in Downloads or Library.

Version details & checksums

Windows

1.1.9 · Microsoft Store

View in Microsoft Store

For Intel Macs, Windows on ARM, or Linux, use the web app.

Open the web app Send feedback