Skip to content

Website maintenance after launch: a first-month checklist

On launch day, complete the website's most important visitor journey. In week one, repeat it on a phone and check the links people use to get there. In month one, confirm who receives alerts, where backups are kept, and who owns follow-ups.

Jump to the template

Day one: check the result at both ends

For a small service website, test a marked enquiry. Open the main page on a phone, go through the form, and look for confirmation. Then ask the client to verify the test email arrived in the intended inbox.

Record the page, time, and outcome. Agree on who to contact when the form fails. A confirmation screen alone cannot tell you where the message went.

Week one: check what visitors actually use

Repeat the mobile journey and verify the menu, contact links, and main landing pages. If this launch replaces an old site, test a few frequently used old addresses and confirm they reach the intended new pages.

Turn findings into tasks with owners and a date to retest. Keep the first result in a TodoNote task note. If the enquiry needs regular testing, create a weekly recurring task for it.

TodoNote workspace showing Check the enquiry form in week one
The first test checked both the confirmation page and the inbox. A short weekly check follows.

Month one: confirm maintenance ownership

Make sure the person doing maintenance receives alerts and knows when the domain renews. Record where backups are kept and how to restore them. If possible, verify recovery in a test environment and keep the date of that check.

Give the client a short handoff: resolved problems, remaining work, and who to contact if the site stops working. Close one-off tasks and keep only the checks that should repeat.

Copy this post-launch maintenance checklist

Start with one important visitor journey. Add checks for other parts of the site as needed.

Day one: key pages, enquiry form, and delivery to the inbox
Week one: mobile navigation, key links, and old URLs
Week one: record issues, owners, and retest dates
Month one: review alert recipients and domain renewal
Month one: document backups, recovery, and maintenance ownership
Ongoing: set a frequency for checks that still need repeating
Try this workflow in TodoNote

A check is ready to hand off when the next person can find its last result and knows what to do next.

Google SRE reference on launch checks

Related guide · Product launch checklist: prepare, release, and verify the result

Start for free