Skip to content

What to regression test after a feature change, with a checklist

Start regression testing with the impact of the change. Check input boundaries, workflows that use the result, and records that should retain their original values. Give each case an expected and actual outcome before making a release decision.

Jump to the template

Turn the new rule into observable cases

A shop applies a 10% discount to a merchandise subtotal of 100 or more. Shipping does not count toward the threshold. Write expected eligibility for 99.99, 100.00, and 100.01. Use the team's existing rounding rule for expected totals.

For 100.00, the discount is 10.00. These cases let you distinguish the eligibility check from the calculation. Use test orders to set up the required inputs.

Follow the result into other parts of the order

Take the same test order through the cart, checkout, order details, and receipt. Compare the discount and total in each view. Also open a test order created before the change and check that its stored total is preserved.

In TodoNote, record the build, expected result, and observation in the task note. Make receipt and history checks separate subtasks. Passing the boundary test completes that check while the others stay open.

TodoNote workspace showing Check the order discount change
The exact threshold passed. The receipt and historical order tests remain open.

Make failures easy to retest

If a total differs, capture the test order reference, screen, and build. After a fix, repeat the failed case, then follow the affected checkout flow to see if it still works.

For deferred checks, write down the impact and who is responsible. The test record should show what passed, what needs retesting, and what still needs a release decision.

Copy this regression testing checklist

Use one copy per change. Record one case for each affected path and capture what you observed.

Change and build under test:
Input boundaries and expected amounts:
Core workflow and expected outcome:
Downstream views that use the result:
Historical records that should keep their values:
Actual outcomes and evidence:
Owners and retest dates for failures:
Try this workflow in TodoNote

Test the paths with the greatest impact first. Then add lower-impact cases based on how widely the change is used.

ISTQB Foundation Level syllabus on impact analysis and regression testing

Related guide · A Bug Report That Answers the Developer’s First Questions

Start for free