MCP connects a compatible AI client to tools and data. Agent Skills describe how to perform a type of work, including its steps and judgment rules. A task note holds the facts, progress, and decisions for the job in front of you. Connecting a service does not teach the AI your process, and installing a Skill does not grant access to your workspace.
If the AI can read your feedback but keeps treating incomplete reports as confirmed defects, improve the procedure. If it knows the procedure but cannot see this week's feedback, provide the material or an authorized connection. Identifying the missing layer prevents unnecessary setup.
Separate the method from the current batch
Maya is turning customer feedback into help-center topic proposals. The task note contains numbered reports, original wording, and the circumstances of each event. Her procedure says to distinguish documentation gaps, product defects, and reports that need clarification. MCP provides the tools for reading the note and saving the reviewed result.
Keep reusable rules in the Skill: preserve report IDs and merge reports only when they describe the same user and event. Keep this week's deadline, customer details, and progress in the task. Moving current facts into a reusable procedure makes the next run start with stale assumptions.
| Situation | Response | Record to keep |
|---|---|---|
| Method is clear, material is missing | Provide the batch or authorize access | Target task and report IDs |
| Material is available, decisions are wrong | Improve the procedural rule | Failed case and expected treatment |
| Method and material are available | Review output before saving | Accepted findings and open questions |
Read, propose, review, then save
Have the client locate the target task and read its full note. Ask it to identify the report IDs and missing fields before classifying anything. Review the proposed categories, then create follow-up tasks such as asking which software version was involved. Save accepted conclusions with their supporting report IDs.
TodoNote task search matches titles, so locating a task does not mean its body has been read. Skill loading depends on the client; an MCP connection alone does not provide that feature. If a client cannot load Skills, supply the procedure in the current request.
Keep unresolved work visible
The record keeps F-03 unclassified until its version and reproduction details are available. The reusable rule says to clarify incomplete evidence; the task contains the actual unanswered question. A new batch can reuse the rule without inheriting the old incident.
A template you can copy
Goal and expected deliverable:
Task title / ID:
Source report IDs:
Allowed read scope:
Reusable steps:
Classification rules:
Handling of missing information:
Source fields that must survive:
Required output:
Decisions needing human review:
Allowed follow-up tasks:
Read the full note before saving:
New test cases and pass criteria: Check the write boundary
Use read access for analysis and check the requested write permissions before creating tasks or saving notes. Updating a TodoNote note replaces the full document. Read the current text, preserve material that should remain, and submit the complete updated version after review.
Finally, try reports that were not used to write the procedure. Check whether IDs survive, uncertain reports remain uncertain, and conclusions point back to the source. A smooth demonstration is less useful than a process that handles a new ambiguous report correctly.
See the tasks and subtasks guide for the controls, and How to Write Agent Skills: Turn Work Notes into a Reusable SKILL.md for the next step.
Background reading: original source.